If any of the work involves a change of land use, then we may require the assessment of a development proposal against the Codes in the Brisbane Port Land Use Plan 2020 and Port of Brisbane Technical Standard 2020.
For more information relating to planning or land use matters please contact PBPL’s Planners on 07 3258 4888 (during business hours).
All contractors must review the information below and, where necessary, undertake or obtain the required inductions and permits prior to works commencing.
CONTRACTOR GUIDELINES
inductions
All contractors working for, or on behalf of, the Port of Brisbane Pty Ltd (PBPL) are required to undertake Safety Online once a year to ensure that they remain safe while working at the port and that their actions cause minimal impact on the environment.
CLICK HERE TO ACTIVATE THE PORT OF BRISBANE SAFETY ONLINE PROGRAM
All contractors working for, or on behalf of, Port of Brisbane Pty Ltd (PBPL) at the Brisbane International Cruise Terminal must complete an induction prior to commencing work. The induction must be completed [annually].
CLICK HERE TO ACTIVATE THE BRISBANE INTERNATIONAL CRUISE TERMINAL SAFETY ONLINE PROGRAM
All contractors working for, or on behalf of, Port of Brisbane Pty Ltd (PBPL) at the Operations Base worksite must complete an induction prior to commencing work.
CLICK HERE TO ACTIVATE THE Operations base SAFETY ONLINE PROGRAM
All contractors working for, or on behalf of, Port of Brisbane Pty Ltd (PBPL) at the Brisbane Multi-Modal Terminal worksite must complete an induction prior to commencing work.
CLICK HERE TO ACTIVATE THE Brisbane Multi-modal terminal SAFETY ONLINE PROGRAM
All contractors working for, or on behalf of, the Port of Brisbane Pty Ltd (PBPL) and are entering a Hazardous Area are required to undertake the Hazardous Area Induction once a year to ensure that they remain safe while working in the Port North Common User Berth Hazardous Area and the Pinkenba Common User Facility Hazardous Area.
CLICK HERE TO ACTIVATE THE HAZARDOUS AREA ONLINE PROGRAM
All contractors working for, or on behalf of, Port of Brisbane Pty Ltd (PBPL) on the TSHD Brisbane vessel worksite must complete an induction prior to commencing work.
CLICK HERE TO ACTIVATE THE TSHD Brisbane SAFETY ONLINE PROGRAM
All Port of Brisbane Pty Ltd (PBPL) personnel and contractors working for, or on behalf of PBPL who are working on or near mooring lines must complete an induction prior to commencing work.
CLICK HERE TO ACTIVATE THE PORT OF BRISBANE LINES INDUCTION
permits
HOW TO OBTAIN A PERMIT TO WORK FROM PBPL
- PBPL Permit to Work Procedure
- Confined Spaces
- Electrical Safety
- Excavation and Digging
- Hot Work
- Plant Isolation
- Working at Heights
To find out if the work you are completing requires a permit, please answer seven quick questions by clicking on the Permit to Work Questionnaire.
If a Permit to Work is required, you must provide the following forms:
Permit to Work Form (a form to obtain PBPL authorisation to perform a 'specified high risk task'). All General Contractors performing works for PBPL must supply a current Site Specific Risk Assessment and/or Safe Work Method and relevant Control Forms from the list below (key safety requirements for each permit).
Please present the required documents to a PBPL Authorised Person before starting work.
- Plant Isolation Control Form
- Plant Isolation Steps Sheet
- High Voltage Access Permit
- High Voltage Switching Sheet
- High Voltage Test Permit
- High Voltage Unplanned Switching Record
- Live Electrical Control Form
- Hot Work Control Form
- Excavation and Digging Control Form
- Excavation Log
- Work at Heights Control Form
- Confined Space Control Form
- Permit to Work Transfer Form
- Permit to Work Form - Section 7 Additional Sign On-Off Sheet
DOCUMENTATION / RECORDING OF INFRASTRUCTURE
To ensure optimal accuracy and consistency of records, PBPL require all electronic and hard-copy drawing and specification sets for works including but not limited to demolition, services/infrastructure/building modifications, civil works, new construction to accord with PBPL’s: